North/South Rail

 

After the idea of utilizing tunnels, merging the East/West High-Speed Rail project with the North/South Rail Project is the most important part of realizing both projects.

The TMT is a natural tie into the North/South Rail Project. By constructing them at the same time huge savings are accrued.

Screen Shot 2019-12-27 at 6.33.14 AM.png

While the North/South Rail Project benefits only the eastern part of the state the cost would be borne by all the Commonwealth’s citizens. The Alternative 7 East/West High-Speed rail project is just the opposite. Put them together and the whole State shares the benefits and the costs. Coupled with rejuvenation of the existing transit system, these projects would not only propel the Commonwealth to the front of the nation’s transportation systems, but most systems of the world.

Among other things, the projects would share:

  • Project mobilization cost

  • Tunnel boring machine costs

  • Engineering costs

  • Design costs

  • Worker training costs

  • Administration costs

  • Disposal of tunnel spoils cost

  • Political credit/cost

Screen Shot 2019-12-27 at 6.34.09 AM.png